190E 2.3 (201.028) L4-2.3L (102.985) (1987)
8 Insert sliding roof headlining from the front top until the clips contact the sliding roof, then introduce the pipe into the conduit on the sliding roof
headlining.
9 Close sliding roof by half and insert sliding roof headlining audibly at front into clips (4 clips).
10 Close sliding roof, lift approximately by half at the rear and in this position check whether lateral screening can be perfectly pulled out and in.