190E 2.3 (201.028) L4-2.3L (102.985) (1987)
3 Remove fastening angle for pop-up sliding roof cover from lateral guide (slotted plate) in upward direction and remove water gutter.
4 Unscrew transporting bridge and remove.
5 Slide lifting angle up to stop in forward direction, tilt in upward direction and remove diagonally in inward direction.
Installation