190E 2.3 (201.028) L4-2.3L (102.985) (1987)
6
Check gap with valve gauge and correct if necessary using shims.
7
Fit ribbed V-belt and tension.
8
Install fan hood and fan.
9
Check function of air conditioning system See: Testing and Inspection
Removing and Installing V-belt pulley
Removing
1
Remove spring plate.
2
Remove locking ring in front of V-belt pulley (arrow) and tap off V-belt pulley using plastic mallet.
3
Renew roller bearing if necessary. Remove locking ring from roller bearing (arrow).