mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Propeller Shaft/Vibration Damper/Flexible Coupling|Page 5510 > < Propeller Shaft/Vibration Damper/Flexible Coupling|Page 5508
Page 3
background image

Installation note:  The installation position is correct, if the vulcanized arrow on vibration damper behind hump is mounted on three-legged
flange (cutouts). Replace self-locking hexagon nuts; Tightening torque 40 Nm.

3  On propeller shafts without vibration damper, be sure to mark the flexible coupling in relation to three-legged flange of propeller shaft.

4  Soft pull-push flexible coupling (soft pull-push) according to lettering "DIESE SEITE ZUR GELENKWELLE" (THIS SIDE TOWARD

PROPELLER SHAFT).

Propeller Shaft/Vibration Damper/Flexible Coupling|Page 5510 > < Propeller Shaft/Vibration Damper/Flexible Coupling|Page 5508