260E (124.026) L6-2.6L (103.940) (1988)
21 00 right into guide block (lateral guide) and groove in angular lifting arm.
11 Install tilting/sliding sun roof top panel.
NOTE: Pull off adjusting gauges only following installation of tilting/sliding sun roof top panel.
12 Screw control cable to sliding carrier.
13 Actuate tilting/sliding sun roof cover several times in all positions.
14 Check mark on holder of tilting/sliding sun roof headlining in relation to mark on slide rail.
NOTE: If the mark is outside notches on slide rail, readjust control cable.
15 For further installation proceed in reverse order.