300CD (123.153) L5-3.0L DSL Turbo (617.952) (1982)
Injection Timing: Adjustments
With Digital Tester (RIV Method)
ADJUSTING INJECTION TIMING (BEGIN OF DELIVERY) WITH DIGITAL TESTER (RIV METHOD) - FOLLOWING CHECKUP
Testing and adjusting value
RI-adjusting value (indirect injection timing) ..................................................................................................................................... -15° after TDC
Tightening torque
Closing plug on regulator (measuring point) ........................................................................................................................... 30-35 Nm 22-26 ft lb)
Special tool
Note: Prior to adjustment, check injection timing.
Adjusting
1. Mount holding bracket (01) on injection pump housing.
2. Place adjusting device (02) on cylinder head screws and holding fork (arrows).