300CD (123.153) L5-3.0L DSL Turbo (617.952) (1982)
17. Center upper suspension.
1st version
2
Frame cross member
5
Spring Strut
5c
Upper rubber mount
5d
Lower rubber mount
5g
Hex. screw
5h
Spring washer
5q
Screw connection
B3
Pressure line (pressure hose) pressure reservoir - spring strut
Pull spring strut (5q) on screw connection several times in upward direction and push down again. The upper rubber mount (5c) should lift each
time from the mounting surface in frame cross member.
2nd version
2
Frame cross member
5
Spring strut
5c
Upper rubber mount
5d
Lower rubber mount
5g
Hex. socket screvv
5i
Disc
5q
Screw connection
B3
Pressure line pressure hosel pressure reservoir spring strut
Upper rubber mount (5c) should be placed in center of receiving unit.
18. Tighten hex. screw or hex. socket screw of upper suspension while applying counterhold on screw connection.