300E (124.026) L6-2.6L (103.940) (1990)
3. Mark location of holding links on center console.
4. Disengage holding links with special tool and pull out tunnel lining.
Note: Use offset end with 135° for removal, the other end with 12O° for installation.
Installation
5. Push holding link outward with special tool and introduce.
6. For further installation proceed vice versa.