mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Engine - Block Heater Installation|Page 2579 > < Engine - Block Heater Installation|Page 2577
Page 3
background image

Parts Information

Time Allowance

20 0950

Block heater, subsequent installation

2.0 hrs. | 91

For remaining models - refer to latest Time Guide Microfiche

B - Work Instructions

B.

ENGINE 119 (MODEL 500 SL)

1.

Lift vehicle.

2.

Remove encapsulation panel from below engine and left side encapsulation panel.

3.

Drain engine coolant at lower right radiator drain fitting. Drain coolant into a suitable container for reuse later.

Engine - Block Heater Installation|Page 2579 > < Engine - Block Heater Installation|Page 2577