mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

A/C - ACC Production Change|Page 8870 > < A/C - ACC Production Change|Page 8868
Page 1
background image

Heater Core: Service and Repair

Automatic Climate Control System Components

REMOVAL:

1. Disconnect the negative battery cable.
2. Drain the engine coolant.
3. Disconnect the heater supply and return hoses.
4. Remove the instrument panel.   See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and Repair

A/C - ACC Production Change|Page 8870 > < A/C - ACC Production Change|Page 8868