mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Ventilation Switch|Testing and Inspection|Page 9100 > < Refrigerant Pressure Sensor / Switch, HVAC|Testing and Inspection|Page 9096
Page 1
background image

Ventilation Switch: Testing and Inspection

Fresh/Recirculated Air Switch Location

1.

Remove the ACC control unit. Refer to COMPONENT REPLACEMENT AND REPAIR PROCEDURES.

2.

Carefully pull out the switch.

3.

Disconnect the electrical connector from the switch.

Fresh/Recirculated Air Switch Testing

4.

Connect an ohmmeter between terminals 3 and 4.

Fresh Air/Recirculation Switch Testing

5.

Depress the symbol side of the switch ("ON"). The resistance should be:

0 - 1 ohm

6.

Release switch. The resistance should be:

Infinite resistance

Ventilation Switch|Testing and Inspection|Page 9100 > < Refrigerant Pressure Sensor / Switch, HVAC|Testing and Inspection|Page 9096