Throttle Cable/Linkage: Adjustments

Throttle Linkage Assembly

1.

Disconnect the Bowden cable (30) by pressing off the plastic clip at the arrow.

2.

Disconnect rod (2).

^

Verify that the throttle valve rests against the idle stop. If not, repair or replace the throttle valve as necessary.

3.

Reconnect rod (2).

^

If there is tension on the rod when reconnecting adjust it so that the roller (15) rests against the end stop without tension in the slotted link arm
(13).

4.

Disconnect rod (8). 

5.

Adjust rod (8) to approx. 6-7/64 in. (155 mm) measured from the center of the ball sockets. Reconnect the rod.

6.

Reconnect the Bowden cable (30).

^

The nipple (26) of the Bowden cable must contact the compression spring (27) without tension. If necessary adjust the Bowden cable using
adjusting nut (32) from inside the vehicle. 

7.

Disconnect the A/T control pressure cable (11).

8.

With the engine (OFF) depress the accelerator pedal completely to the full throttle stop (36) or, with A/T to the stop of the kickdown switch (38).

^

The throttle valve lever must rest against the full throttle stop. If necessary adjust nut (29) on the Bowden cable to attain the correct position.

9.

Let the accelerator pedal return to the idle position slowly.

^

The roller (15) in the slotted link arm (13) must contact the end stop without tension and the micro-switch (S27/2) must be actuated. If
necessary adjust the Bowden cable using nut (32). 

10.

Reconnect the A/T control pressure cable without tension. If necessary adjust nut (43) to attain proper adjustment.