mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Removal and Installation of Control Rod|Page 474 > < Removal and Installation of Control Rod
Page 2
background image

3

On 1st version with steel joints (standard up to March 1971) remove respective locking clip (7b) and pull off ball pin. Provide ball sockets with
grease. Replace damaged sealing washers (7c) or worn-out ball joints.

Attention!  Do not pull ball pin of plastic-mounted ball joints out of ball socket.

Installation

4

Attach connecting rod lever to lever of level controller and to lever of torsion bar. Make sure that lever (6) of torsion bar is in alignment with
connecting rod.

Removal and Installation of Control Rod|Page 474 > < Removal and Installation of Control Rod