mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Engine - Block Heater Installation|Page 2366 > < Engine - Block Heater Installation|Page 2364
Page 5
background image

10.

Continue routing electrical cable along transmission oil cooler line underneath radiator frame and up to towing eye flap in bumper cover. Attach
with cable ties.

11.

Open towing eye flap in bumper cover. Insert cable plug through slot (Figure 10) in towing eye flap and reinstall towing eye flap in bumper cover.

12.

The cable may now be easily accessed for winter use or alternately reinserted through the slot in the towing eye flap for storage when not needed
(Figure 11).

13.

Reinstall encapsulation panels.

14.

Test coolant for sufficient antifreeze protection, refill and bleed cooling system. Pressure test system for leaks.

15.

Run engine. Check for proper coolant level.

Parts Information

Recommended Labor Time

Operation: Block heater and electrical cable, subsequent installation

Operation Number

Time

Model(s)

20-5480

1.9hrs.

A2/A3

Note:

The subsequent installation of a block heater in these models is at the customer's expense.

Engine - Block Heater Installation|Page 2366 > < Engine - Block Heater Installation|Page 2364