300SE (140.032) L6-3.2L (104.990) (1992)
5
Check clearance between vertical window guide channel and outer edge of glass. Clearance should be 0.3 mm at front and rear.
6
Move window stay to correct clearance (step 14).
7
Install cover on inside of window stay.
8
Pull out sealing frame in area of window stay.
9
Loosen screws (arrows) on window stay.
10
Adjust window stay so that vertical clearance between window guide channel and outer edge of glass is 0.3 mm at front and rear.