mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Vacuum Pump, Locks|Specifications|Page 8472 > < Vacuum Pump, Locks|Specifications
Page 1
background image

Vacuum Pump: Testing and Inspection

Preliminary operation:
Check function of central locking, See: Body Control Systems/Testing and Inspection/Component Tests and General Diagnostics

Prepare for testing 

Numbers 1 - 3.

Check supply pump vacuum 

> 450 mbar in <= 3 seconds.

Check supply pump pressure 

> 450 mbar in <= 3 seconds.

Check the safety switching time by separating the supply pump from the line system

< 30 seconds with central locking and interior central locking. 
< 70 seconds for the auxiliary consumers, vacuum, and orthopaedic backrest.

 

Special tool

 
Parts for the test

Reservoir

107 800 08 19

Distributor piece

117 078 01 45

Sealing cap

000 987 11 45

Preparing test

1

Connect reservoir with distributor piece to the tester for vacuum and pressure Systems.

2

Remove supply pump and seal pneumatic distributor plug. (Do not remove cable harness). See: Service and Repair

Vacuum Pump, Locks|Specifications|Page 8472 > < Vacuum Pump, Locks|Specifications