300SL (129.061) L6-3.0L (104.981) (1991)
3
Mark position of catches with felt tip pen.
4
Screw off nuts (arrows).
5
Open cable straps (arrows) and expose hydraulic lines.
3
Mark position of catches with felt tip pen.
4
Screw off nuts (arrows).
5
Open cable straps (arrows) and expose hydraulic lines.