mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Engine - Block Heater Installation|Page 2314 > < Engine - Block Heater Installation|Page 2312
Page 4
background image

7.

Route and fasten the cable harness along power steering hose using cable ties.

8.

Reinstall secondary air injection elbow.

9.

Close coolant drain plug.

Tightening torque: 30 Nm

10.

Reinstall lower engine panel.

11.

Lower vehicle

12.

Route cable plug to a convenient location as per customer preference. Secure cable and plug with cable ties.

Note:

Ensure that cable is routed away from moving engine parts and sources of high heat.

13.

Test coolant for sufficient antifreeze protection, refill and bleed cooling system. Pressure test system for leaks (Figure 3).

14.

Run engine. Check for proper coolant level.

Parts Information

For Recommended Labor Times see Warranty Time Guide

Operation: Block heater, subsequent installation

C. Engines 602.962, 603.970 (300D 2.5, 350SD/SDL Turbo)

As is the case with all diesel engines as of model year 1986, models with engines 602.962 and 603.970 are equipped with a factory-installed block heater
as standard equipment. The electrical cable and the heat shield for the block heater, however, are not installed. The following procedure details
installation of the cable and heat shield.

1.

Lift vehicle.

2.

Remove encapsulation panel from below engine.

3.

Attach electrical cable to block heater. Route cable away from exhaust manifold along transmission oil cooler line using cable ties.

4.

Install heat shield over block heater, with 2 new hex. socket screws and spring washers.

5.

Route cable plug to a convenient location as per customer preference. Secure cable and plug with cable ties.

Engine - Block Heater Installation|Page 2314 > < Engine - Block Heater Installation|Page 2312