mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Sunroof - Modified Control Cable|Page 9545 > < Sunroof - Modified Control Cable|Page 9543
Page 2
background image

7 Coat coil at end of new control cable with MB lubricating paste, part no. 001 989 14 51, and introduce into tube.

NOTE:  When installing control cable, make sure that the guide member on control cable slides into opening of tube.

8 It should be possible to pull the control cable out with a force of max. 80 N. Checkup with a spring scale.
9 Slip control cable completely into tube, push actuating switch to "Lower roof" and let cable control run into gear unit until the bores of guide plate and

sliding carrier are overlapping.

Sunroof - Modified Control Cable|Page 9545 > < Sunroof - Modified Control Cable|Page 9543