560SEC (126.045) V8-5.6L (117.968) (1989)
6. Check suspension parts.
Note:
The mounting bracket for the bottom shock absorber mount must always be seated tightly in the rubber mount; it must not be possible to
turn the rubber mount in the suspension eye.
Top mount
75a
Hex. nuts
75b
Washer
75c
Top rubber ring
75d
Bottom rubber ring
75e
Plate
75f
Dust protector
75g
Snap ring
75i
Clamping strap
76
Dome on frame floor
7. Position shock absorber and install upper mount. Ensure that parts are seated correctly. Screw the bottom hex. nut down to the end of the threads,
then counter with top nut.
Note:
The dust protector (75f) is only installed on vehicles for countries with poor road conditions.
Bottom mount
72
Semi-trailing arm
75L
Rubber bushing
75m
Mounting bracket
8. Install bottom mount on semi-trailing arm. when the weight is on the wheels, it is most practical to lower the semi-trailing arm by lifting the
vehicle at the rear axle until it is at the same height as the mounting bracket on the shock absorber.