C 230K (202.024) L4-2.3L SC (111.975) (2001)
2. Position pull cable (11) on bolt (16) on tilting bracket (10).
3. Install tilting bracket (10) in sliding/pop-up roof frame and push toward rear.
4. Close cover (8), screw in screw (7).
5. Install slide rail (6)
6. Push tilting bracket (10) toward front and install water drain trough (4).
7. Align tilting bracket (10) so that mark (arrow) on tilting lever (12) and slider (13) coincides with mark (arrow) on slide rail (6).
NOTE: Markings (arrows) must coincide in order to install sliding roof drive (3).