C 240 Sedan (203.061) V6-2.6L (112.912) (2002)
Step H1: Adaptive pre-control for lambda control (at part load).
Step H2: Adaptive pre-control for lambda control (at idle speed).
Note:
The path to the screens to perform the adaptive pre-control for lambda control (Fig. 19 and Fig. 20) in DAS are as follow:
^ ME-SFI 2.8 Motor electronics 2.8
^ Fault path tests performed
^ Measures for initiating the fault path tests
^ Step 6 Self adaptation of mixture formation