mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

AN82.25-P-0001-08CW Carry Out Initial Startup of Rental Vehicle Functions|Page 13880 > < AN82.25-P-0001-08CW Carry Out Initial Startup of Rental Vehicle Functions|Page 13878
Page 10
background image

The left front door electrical connector (X35/1) is used to connect the taxi's two-way radio speaker (H6) to the rental vehicle wiring harness.

Installation of lines into engine compartment

37

Remove cover (46) from housing (47) of front SAM control unit with fuse and relay module (N10/1).

38

Route the branch-off line (1q) of the rental vehicle wiring harness through the opening (arrow A) in the housing (47) and out of the vehicle interior
into the engine compartment.

39

Cut the lines (red, black) of the branch-off line (1q).

Cut lines (red, black) offset to each other so that the cable connectors (43) can be mounted offset to each other later on, as shown. Apart from this,
the lines (red, black) must be cut such that later on both cable connectors (43) are located in the housing (47).

40

Remove the sealing element (32) of the housing (47) and penetrate a free contact cavity (arrow B) of the sealing element (32).

41

Route the ends of the lines of the cut off connector-side branch-off line section from the outside through the penetrated contact cavity (arrow B) of
the sealing element (32).

42

Join the lines (red, black), as shown, using cable connectors (43). When doing so, observe the color coding of the lines (red, black).

The cable connectors (43) are to be removed from the wiring harness repair kit.

43

Position the connector-side branch-off line section (1q) in the sealing element (32) such that the end of the line binding is located on the dry side
of the sealing element (32).

44

Fill the penetrated contact cavity (arrow B) of the sealing element (32) from the inside using sealant so that no subsequent leakages can occur.

45

Route branch-off line (1q) of rental vehicle wiring harness, as shown, into the housing (47) and install the sealing element (32) into the housing

AN82.25-P-0001-08CW Carry Out Initial Startup of Rental Vehicle Functions|Page 13880 > < AN82.25-P-0001-08CW Carry Out Initial Startup of Rental Vehicle Functions|Page 13878