mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Traction Control - Steering Angle Harness Modification|Page 6871 > < Traction Control - Steering Angle Harness Modification|Page 6869
Page 4
background image

Figure 6

11. Connect red/yellow wire (removed from fuse carrier) to auxiliary wire (right arrow, Figure 5), which was spliced into circuit 30Z (step 5), using

approved splicing method (magnification, Figure 6). Secure wire splice to harness using cable ties.

Note: 
Refer to S.I. 54/76 (May 1996) for proper method of splicing and connecting wires in a wire harness. Ensure wire splice has loop for strain relief and is
covered with premium quality electrical tape (e.g. 3M Scotch 33 [R]) which is resistant to heat.

12. Reinstall fuse carrier (left arrow, Figure 5) back into fuse box.

13. Reassemble in reverse order, reconnect battery negative terminal (refer to WIS or SMS; Grp. 54.10; job no. AR54.10-P-0003; for proper

initialization of electrical systems after reconnection of battery).

14. Erase all DTC's using StarDiagnosis (DAS) and road test vehicle.

Parts Information

IN CASE OF WARRANTY
Operation: Steering angle modification

Traction Control - Steering Angle Harness Modification|Page 6871 > < Traction Control - Steering Angle Harness Modification|Page 6869