mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

AR05.10-P-7601-01R Separate Timing Chain|Page 3862 > < AR05.10-P-7601-01R Separate Timing Chain|Page 3860
Page 3
background image

8 Place movable assembly insert (4) with the digit D5 into theme riveting tool (5). 

9 Insert new outer plate (15) into the movable assembly insert (4).
The outer plate (15) is held by a magnet.

10 Fit on rivet press tool (5) 
The guide spacers must lie on the control chain rollers (2). Ensure that riveted link (7.1)  and outer plate (15) are aligned.  
11 Screw in pressure screw (5a) at rivet press tool (5) until solid resistance is felt. 
While turning the pressure screw (5a), ensure that the pin in rivet link (7.1) is inserted in the holes in external mounting link (15).
12 Take off riveting tool (5).

13 Turn over movable assembly insert (4) to the riveting section (arrow).
14 Fit rivet press tool (5) at the center onto one of both timing chain pins of the riveted link (7.1).
15 Tighten thrust spindle (5a) of rivet press tool (5) and rivet first control chain bolt of  riveted link (7.1).

AR05.10-P-7601-01R Separate Timing Chain|Page 3862 > < AR05.10-P-7601-01R Separate Timing Chain|Page 3860