mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Body - Tension Cable Detached From Convertible Top|Page 17395 > < Body - Tension Cable Detached From Convertible Top|Page 17393
Page 4
background image

NOTE:  Allow a flash-off time of five minutes.

d. Clamp adhesive seam using spring clamps & straight edge (Figure 12)

NOTE:  After bonding, the adhesive seam must harden for at least 5 hours.

9. Reassemble soft top C- Pillar.

10. Install rear window.

NOTE:  If this condition occurs, the soft top canvas must be repaired by bonding the fold seam. Do not replace the soft top canvas if the fold seam
has become detached.

Parts Information

NOTE:  The following allowable labor operations should be used when submitting a warranty claim for this repair. This information has been generated
on September 29, 2008. Please refer to Netstar -> Star TekInfo -> Star Time for the most current labor time allowance.

In Case of Warranty

Operation: Soft top rear window, R&R (77-3310)

Roof repair (77-0000)

Body - Tension Cable Detached From Convertible Top|Page 17395 > < Body - Tension Cable Detached From Convertible Top|Page 17393