mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Procedures|Page 14534 > < Procedures|Page 14532
Page 14
background image

2. Route trailer hitch wiring harness (20) along trailer hitch crossmember (1) and fasten with clips to existing stud (enlarged view).
3. Guide the trailer hitch socket (13-pin) (X58) to the bracket beneath the trailer hitch crossmember (1).

4. Route the trailer hitch wiring harness (20) along existing wiring to the installation point of the rear SAM control unit with fuse and relay module

(N10/2) and fix in place.
The hole must be sealed with a grommet (33) to prevent water entry.

5. Connect brown cable (br) to left taillamp trunk ground (W6/1) (detail).

6. Plug the violet, 5-pin coupling (vi) of the trailer hitch wiring harness (20) in the violet slot (15) of the rear SAM control unit with fuse and relay

module (N10/2).
The violet coupling (vi) is coded.

7. Plug the turquoise-colored and black fuse holder for fuse 17 (N10/2f17) and fuse 18 (N10/2f18) into the rear SAM control unit with fuse and relay

module (N10/2) and insert a 20A fuse for fuse 17 (N10/2f17).
Fuse 17 (N10/2f17): Turquoise-colored holder with red/green line, Fuse 18 (N10/2f18): Black holder with red/yellow line
Connect fuse 18 (N10/2f18) only if trailer is being towed, otherwise an external consumer could drain the battery.

Procedures|Page 14534 > < Procedures|Page 14532