mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

AR65.00-P-1000-01Q Install Base Plates|Page 14828 > < AR65.00-P-1000-01Q Install Base Plates|Page 14826
Page 3
background image

Allow primer to air-dry for at least 10 minutes.

Observe manufacturers instructions.

12. Area A, apply sealing compound.
13. Position washers onto the threaded bolts.
14. Attach base plates (1).
15. Spread glue onto the edge of the areas. Remove excess material.

Observe manufacturers instructions for the setting time of the adhesive.

16. Mount roof rack (3), at the same time use suitable wrench for this roof rack (11)

Mount roof rack on vehicle at the latest after 10 minutes. Otherwise a correct assembly of the roof rack is no longer possible.

17. Leave roof rack (3) on vehicle for at least 60 minutes.

Observe flash-off time of the adhesive.

18. Remove roof rack (3) and mount water repellent.

AR65.00-P-1000-01Q Install Base Plates|Page 14828 > < AR65.00-P-1000-01Q Install Base Plates|Page 14826