mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

GF47.30-P-2020V Purge Control Valve - Description of Components|Page 7266 > < GF07.61-P-3032V ME-SFI TWC Heating-Up, Function|Page 7260
Page 1
background image

Canister Purge Control Valve: Description and Operation
GF47.30-P-2020V Purge Control Valve - Description of Components

GF47.30-P-2020V Purge Control Valve - Description Of Components

Location

The purge control valve is located in the engine compartment.

Task

Opening or closing the connection line between the activated charcoal canister and the intake manifold (purge line).

Design

Electric switchover valve with two line terminals and one 2-pin plug connection.

Function

The purge control valve is actuated on the ground side by the motor electronics control unit, depending on operating condition of engine and on the
vehicle load of the activated charcoal canister, at the ground end with a pulse width modulation signal (duty cycle 0 to 100 %).
The voltage supply is performed via circuit 87.

If purging is released, the purge control valve pulses audibly and perceptibly.
At the same time the passage for the purge line from the activated charcoal canister to the intake manifold (a -> b) is opened and closed.

(USA)

The purge control valve is opened and closed for the leak test of the regeneration system. It also detects if the purge control valve jams in open
condition.

GF47.30-P-2020V Purge Control Valve - Description of Components|Page 7266 > < GF07.61-P-3032V ME-SFI TWC Heating-Up, Function|Page 7260