mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Steering - Groan/Vibration With A/C ON|Page 11083 > < Steering - Groan/Vibration With A/C ON
Page 2
background image

3. Gently move the line and install rubber buffer (Figure 2, 3) by screwing it into the power steering rack housing (hole after removing the screw 1 in
Figure 1).

Note:

Do not over tighten the rubber buffer as the rubber part might tear.

4. Position the high pressure power steering line bracket onto the installed rubber buffer as depicted in Figure 3 (arrow), and secure it with nut (Figure 2,
4). Tighten to 10 Nm

5. Reattach the screw (Figure 1, 2) with the bracket at the other end of the high pressure power steering line.

Note:

Ensure that the high pressure power steering line does not come in contact with other parts of the vehicle.

6. Reinstall lower engine compartment paneling as per step 1.

Note:

Always refer to EPC for latest and additional parts information.

Parts Information

Steering - Groan/Vibration With A/C ON|Page 11083 > < Steering - Groan/Vibration With A/C ON