mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Body - Convertible Top Water Pocket Separation|Page 14952 > < Body - Convertible Top Water Pocket Separation|Page 14950
Page 11
background image

9.

Stick surfaces (20) with double-sided adhesive tape (Figure 31). This is for fastening the padded mat to the main pillar (11) and fabric tensioning
bow (2) (Figure 8).

10.

Fasten the padded mat to fabric tensioning bow (2) and main pillar (11) (Figure 8). The position is specified by the perforation on the woven net
cloth.

11.

Rivet the plastic clip (corner of C-pillar) together with the long elastic band or strap fixed in position beforehand. Rivet with rivet (7) (Figure 32).

12.

Insert pinch roll of soft top canvas of main pillar (11) (Figure 8) in the clamping duct of the roof frame. The three clamps (17) must be installed at
the marked points (Figure 33). The lower pinch roll guide must be inserted into the corresponding opening in the roof frame profile.

13.

Attach retaining rail with bolts (3). Do not tighten yet.

14.

Install seal for fabric tensioning bow (2).

15.

Fully tighten bolts (3)

Body - Convertible Top Water Pocket Separation|Page 14952 > < Body - Convertible Top Water Pocket Separation|Page 14950