mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Procedures|Page 19200 > < Procedures|Page 19198
Page 13
background image

2. Route trailer hitch wiring harness (20) in cutout of impact absorber (17).
3. Guide the wiring harness for the trailer hitch (20) through the existing opening below the left taillamp and secure with grommet (18).

4. Route trailer hitch wiring harness (20) along existing wiring to installation location of trailer connection unit [AAG] (N28/1) control unit and

fasten.

5. Connect the black 6-pin coupling and white 4-pin coupling from the trailer hitch wiring harness (20) to the trailer connection unit [AAG] control

unit (N28/1).
The couplings are coded.

6. Connect brown lead (br) to ground, left taillamp in trunk (W6/1).

Procedures|Page 19200 > < Procedures|Page 19198