mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Cruise Control Module|Locations > < Cruise/Idle Speed Control - Contact Box Modification
Page 2
background image

4.

Remove panel (E, Figure 3) from the side of the contact box. The screws (1), lock washers (2) and nuts (3) are to be reused for installing the plug.

5.

Unscrew the plug cover (B, Figure 2) from the modification kit.

6.

Install the plug into the proper opening, ensuring that the polarity mark (F [white dot], Figure 4), is on top.

7.

Fasten plug using screws (1, Figure 4), lock washers (2) and nuts (3).

8.

Snap the 3-row connector into position (G, Figure 4). The 3-row connector has one bottom skirt longer than the other. The long skirt is placed
towards the 2-row connectors already installed. When snapping it into place, ensure that the clips of the 3-row connector snap into the correct
openings. In addition, one side of the 3-row connector strip has a shorter clip (arrow) than the other end (G).

CAUTION!

Installing the 3 row connector backwards will cause it to break.

9.

Place contact box cover back onto the contact box and fasten with six screws (A, Figure 5).

10.

Be sure that all connectors are properly seated allowing for a small amount of play after the contact box has been reassembled.

11.

Reinstall plug covers (B, Figure 5).

12.

Drill a 2.5 mm hole in the contact box cover as per dimensions shown for sheet metal screw (H, Figure 5). The chain on the plug cover is fastened
with the screw supplied.

CAUTION!

Use extreme caution when drilling the hole in the contact box cover. Do not drill deeper than the length of the screw, otherwise damage to the
internal wiring may result. The holes for the sheet metal screws may be drilled into the cover while the cover is off the box. This would avoid the
possibility of damaging the Internal wiring of the contact box while drilling.

Cruise Control Module|Locations > < Cruise/Idle Speed Control - Contact Box Modification