E 350 4MATIC Sedan (211.087) V6-3.5L (272.972) (2006)
15.
Secure ground wiring harness (arrow, Figure 13) to SBC wire harness (A) using two layers of fabric tape (B) in the circled area. Start taping
approximately 35 mm (X = 35 mm, Figure 13) from end of connector cover receptacle (C).
Note:
See last bullet of step 23 note concerning fabric tape placement.
16.
Remount the SBC wiring harness (A, Figure 14) in the wire harness guide (B):
^
Remove wire guide cover (C) and remove SBC wiring harness with grommet (D) from harness guide (B).
^
Reposition wiring harness with grommet (A, Figure 15) into the forward wall opening (B) in the wire guide (C).