mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Procedures|Page 9999 > < Procedures|Page 9997
Page 3
background image

The fuse carrier (19) is no longer required.

5

Disconnect orange connector C11 (arrow A) on front SAM control unit with fuse and relay module (N10/1) and install supply line tie-out (18)
with pin "SLK 2.8X0,8" in chamber 6 (arrow B) on orange connector  C11.

6

Place illuminated door sill molding control unit (1) in front passenger footwell.

7

Connect black 33-pin coupling (8) from wiring harness for supply (3) with illuminated door sill molding control unit (1).

8

Connect white 6-pin coupling (10b) of wiring harness for supply (3) with white 6-pin plug (10a) of wiring harness for illuminated door sill
molding (2).

9

Connect ground (16) of wiring harness for supply (3) to the ground point of right footwell (W15/1).

A maximum of 5 connectors may be connected to a ground point. In the event of over-assignment another ground point should be selected.

Procedures|Page 9999 > < Procedures|Page 9997