mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Procedures|Page 13887 > < Procedures|Page 13885
Page 33
background image

5. Insert relay terminal 30X for trailer (F4kL) into the load compartment fuse and relay box (F4).
6. Insert relay terminal 30 for trailer (F4kU) into load compartment fuse and relay box (F4).

7. Route trailer hitch wiring harness (24) along existing lines from the load compartment fuse and relay box (F4) to the rear SAM control unit

(N10/8).

Procedures|Page 13887 > < Procedures|Page 13885