ML 430 (163.172) V8-4.3L (113.942) (2000)
Pneumatic System: Pinpoint Tests
Figure 1
Preparation For Test - Section 22
Preparation for Test:
1. Review section 0.
2. Review Section 21.
3. Voltage supply to All-Activity-Module (N1) OK,
4. Battery voltage 11 -14 V,
5. Fuses all OK,
6. Remote Central Locking system (RCL) functions property.
Special Tools
Test equipment; See MBNA Standard Service Equipment Program
Description
Brand, model, etc.
Digital multimeter
Fluke models 23, 77 III. 83,85,87