ML 500 (163.175) V8-5.0L (113.965) (2003)
Installation
13
Open lamella roof approx. 100 mm
14
Screw retaining rail (9) to first lamella with mounting screws (6) and hook folding headliner (4) into bracket (4) on 1st lamella
-
Screw on retaining rail (1st lamella) = 1.5 Nm
15
Close lamella roof completely
16
Hook folding headliner (1) into lamella brackets (4) from front to rear up to center frame section (7) with bows (5) and dose brackets (4)
CAUTION:
-
Bows are not symmetrical!
-
Observe "L" stamps on left side.
17
Slide folding headliner (1) on lamella roof frame between guide rail and lamella (arrows) at side
CAUTION: Pay attention to correct position, otherwise folding headliner (1) can cause any water entering to run into the lamella roof
frame at the side
18
Pull folding headliner (1) through below center frame section (7) toward rear
19
Open lamella roof approx. 150-200 mm
20
Fasten folding headliner (1) together with bows (5) into brackets (4) on remaining lamellas
21
Slide folding headliner (1) on lamella roof frame between guide rail and lamella at side
CAUTION: Pay attention to correct position, otherwise folding headliner (1) can cause any water entering to run into the lamella roof
frame at the side
22
Close lamella roof completely
23
Fasten Velcro strip (2a) on folding headliner to Velcro strip (2b) on 9th lamella
24
Check seat of Velcro strips (2), correct if necessary
NOTE: Screw in screw in middle of Velcro strip (if present)
25
Screw on retaining plates (8)
26
Install roof reinforcement (3)
-
Screw on lamella roof frame = 10 Nm
27
Install headliner