mercedesbenz Workshop Repair Guides

Mercedes Benz S 350 Workshop and Repair Manuals

Air Door Vacuum Solenoid Valve, HVAC|Locations|Page 5511 > < Air Door Vacuum Solenoid Valve, HVAC|Locations|Page 5509
Page 3
background image

Vacuum Valve Block - Schematic

-

Valve a, seal connection 5 with blind plugs, connect tester to connection 13, evacuate with tester and read off pressure gauge. If a pressure
increase occurs on the pressure gauge, renew vacuum valve block (36).

-

Valve b, seal connections 5, 6 and 13 with blind plugs, connect tester to connection 7, evacuate tester and read off pressure gauge. If a pressure
increase occurs on the pressure gauge, renew vacuum valve block (36).

-

Valve c, connect tester to connection 12, evacuate tester and read off pressure gauge. if a pressure increase occurs on the pressure gauge,
renew vacuum valve block (36).

CHECKING VACUUM RESERVOIR:

Vacuum Reservoir

-

Connect tester to the red-grey vacuum line (connection 13) and evacuate. If a pressure increase occurs on the pressure gauge, check vacuum
reservoir for leaks. if required, renew line or vacuum reservoir.

-

Connect all vacuum lines up to the grey-green (connection 5) on vacuum valve block.

Air Door Vacuum Solenoid Valve, HVAC|Locations|Page 5511 > < Air Door Vacuum Solenoid Valve, HVAC|Locations|Page 5509