mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Procedures|Page 17148 > < Procedures|Page 17146
Page 14
background image

Steps 16 - 25

Trailer Coupling Mechanical System

AH31.10-P-1000-02SX Notes Regarding Installation of Trailer Hitch

AH31.10-P-1000-02SX Notes Regarding Installation Of Trailer Hitch

The control cable must be hung in the operating lever before the transport lock between the crossmember and swivel ball neck is removed. Otherwise the
system locks and cannot be unlocked.
The ball neck snaps into its two end positions and can only be operated using the cable at the release lever.

In export countries the respective licensing provisions or legal requirements for the installation of a trailer hitch must be observed.

Procedures|Page 17148 > < Procedures|Page 17146