S 600 (221.176) V12-5.5L Turbo (275.953) (2007)
Inner and center threaded connection:
External threaded connection:
1
Tighten bolts 1 to 14 according to tightening stage 1, starting with bolt 1.
2
Drive in dowel pins.
3
Tighten bolts 15 to 28 according to tightening stage 1, starting with bolt 15.
4
Tighten bolts 1 to 14 according to tightening stage 2, starting with bolt 1.
5
Tighten bolts 15 to 28 according to tightening stage 2, starting with bolt 15.
6
Tighten bolts 15 to 28 according to tightening stage 3, starting with bolt 15.
7
Tighten bolts 29 to 35 starting with bolt 29.
8
Tighten bolts 36 to 39 starting with bolt 36.
9
Tighten bolts 40 to 54 starting with bolt 40.
10
Tighten bolts 55 and 56, starting with bolt 55
11
Tighten bolts 57 and 61, starting with bolt 57