S 600 Sedan (140.057) V12-6.0L (120.980) (1994)
14.
The cable may now be easily accessed for winter use or alternately reinserted through the slot in the towing eye flap for storage when not needed
(Figure 5).
15.
Close coolant drain plug.
Tightening torque: 30 Nm
16.
Reinstall encapsulation panels.
17.
Reconnect battery.
18.
Test coolant for sufficient antifreeze protection, refill and bleed cooling system. Pressure test system for leaks.
Run engine. Check for proper coolant level.
Parts Information
Recommended Labor Time
Operation:
Block heater and electrical cable, subsequent installation
Operation Number
Time
Model
20-5480
2.1 hrs.
A4
Note:
The subsequent installation of a block heater in this model is at the customer's expense.
Additional time for "Engine compartment panel(s) - bottom, R & R" (see Time Guide microfiche, group no. 61) may be applied, provided it is not
already included in another repair or maintenance service with the same repair date.