mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

AR05.10-P-7601-01R Separate Timing Chain|Page 4982 > < AR05.10-P-7601-01R Separate Timing Chain|Page 4980
Page 2
background image

1 Cover timing case recess and cylinder head with clean rag.
Parts which have fallen into the timing case recess or in the cylinder head must be removed. 
2 Connect new timing chain (2) to the old timing chain (1) with the assembly link (7., 7.2, 7.3)  and secure. 
3 Remove rag from timing case recess and cylinder head.
Otherwise when cranking the engine, this can be drawn into the timing case recess. 
4 Slowly turn the engine at the center bolt of the crankshaft in the  in direction of engine rotation until the ends of the new control  chain (2) can be
connected. 
During the insertion procedure, old and new control chains (1, 2) must be fed by a second person in and out of the timing  case slot. Old and new 
timing chains (1, 2) are always held by  the retainer (10) in mesh with the camshaft sprockets. 
5 Remove assembly link (7.1, 7.2, 7.3) and old control chain (1).
The assembly link (7.1, 7.2, 7.3) must be replaced by a new rivet link after the new control chain (2) has been inserted. The assembly link (7.1, 7.2,
7.3)is only an aid for assembly and is not suitable for engine operation.

AR05.10-P-7601-01R Separate Timing Chain|Page 4982 > < AR05.10-P-7601-01R Separate Timing Chain|Page 4980