mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Procedures|Page 409 > < Procedures|Page 407
Page 7
background image

Soft Top Hydraulic Components

Special Tool

The hydraulic unit RVC [UVS] (A7/5) is removed and put down in a suitable container for catching escaping hydraulic fluid.

1. Open emergency operation valve (3) on RVC [UVS] hydraulic unit (A7/5) and then tighten with specified tightening torque.

Not when separating hydraulic lines No. 115 and No. 116 on vehicles with code (881) Remote trunk closing (RTC).
By opening the emergency operation valve (3), the pressure in the hydraulic lines is relieved, except in hydraulic line No. 100. The pressure in
hydraulic line No. 100 is still present. It is only possible to relieve the pressure in this line by previously setting up the roll bar hydraulically and
then putting it back down mechanically.

Procedures|Page 409 > < Procedures|Page 407