mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Console - (Center) Switches Loose|Page 567 > < Console - (Center) Switches Loose|Page 565
Page 1
background image

Power Door Lock Switch: Testing and Inspection

Preliminary operation:
Checking the electrical function of the interior central locking. See: Body and Frame/Body Control Systems/Testing and Inspection/Component Tests
and General Diagnostics

Preparing test

 

1

Reinstall lock cylinder into the lock which has been removed.

 

2

Put key in position "b"

 

Console - (Center) Switches Loose|Page 567 > < Console - (Center) Switches Loose|Page 565