mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Engine - Timing Chain Tools|Page 2443 > < Engine - Timing Chain Tools|Page 2441
Page 5
background image

8.

Lay above assembled link removal tool (03) onto the timing chain (Figure 2) and contact the leading link pin (Figure 3).

9.

Using a wrench, turn link remover mandrel (02) in towards the timing chain until contact is made with the timing chain link plate (Figure 2).

10.

Continue by turning mandrel (02a) (with link removal pin) (Figure 2) to press out the timing chain leading link pin from the old timing chain
(Figure 3).

11.

Unscrew link remover mandrel (02) and then remove link removal tool (03) from old timing chain (Figure 4). The timing chain is now separated.

12.

Remove pressed out timing chain link pin (1) from link removal tool (03) (Figure 4).

Installing new timing chain

13.

Connect new timing chain (5, Figure 5) to the old timing chain (4, Figure 5) using the suitable threading link (04) from Special Tool 602 589 02
40 00.

14.

Using a ratchet and socket on the crankshaft, carefully turn engine in direction of rotation, thereby rolling in the new chain (5, Figure 5) onto all

Engine - Timing Chain Tools|Page 2443 > < Engine - Timing Chain Tools|Page 2441