mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

AR47.30-P-8212R Remove/Install Activated Charcol Canister|Page 8001 > < Emissions - Variable DTC's/Driveability Concerns|Page 7996
Page 1
background image

Evaporative Emission Control Canister: Service and Repair
AR47.30-P-8212R Remove/Install Activated Charcol Canister

Remove/install activated charcoal canister

DANGER:

-

Risk of explosion if ignition takes place, risk of poisoning caused by inhaling fuel vapors or swallowing fuel, as well as risk of injury to
skin and eyes exposed to fuel.

-

No fire, sparks, naked flames or smoking.

-

Pour fuels only into suitable and appropriately marked containers.

-

Wear protective clothing when handling fuel.

1

Remove rear right fender liner

2

Detach lines (A, D) at activated charcoal canister (77)

NOTE:  Installation:  Observe "connection diagram" given below.

3

Unlatch activated charcoal canister (77) toward top

4

Install in the reverse order.

Connection diagram of evaporative emission control system

AR47.30-P-8212R Remove/Install Activated Charcol Canister|Page 8001 > < Emissions - Variable DTC's/Driveability Concerns|Page 7996