mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Recall - SBC Wire Harness Modifications|Page 561 > < Recall - SBC Wire Harness Modifications|Page 559
Page 15
background image

Ensure only the following versions of DAS are used:

^

11/2005 with SBC patch 479 installed on SDS

^

Any DAS version after 11/2005

Navigate through the following menu items in DAS and follow on-screen instructions: "Control units/Chassis/SBC - Sensotronic Brake
Control/Control unit adaptations".

Note:

^

Ensure to follow the on-screen instructions in DAS for connecting programming and terminal inspection tool to the SBC hydraulic unit.

^

In the event of malfunctions during the SBC programming, a message will appear in the DAS display and a troubleshooting guide will be displayed.

^

In the event DAS indicates that the SBC hydraulic unit requires replacement after inspecting SBC connector terminals, refer to WIS:
AR42.46-P-0010R (Model 211) and AR42.46-P-0010TX (Model 219)

for replacement instructions. Note (regarding above WIS instructions):

Disregard WIS notes regarding brake bleeder pressure. The maximum pressure for brake bleeder is 2.5 bar.

23.

Secure ground wiring harness and SBC wiring harness (A, Figure 22) to SBC hydraulic unit bracket (B) with cable tie (arrow). Tighten cable tie
(arrow) with Hellermann MK9 cable tie pliers (Special Tool: W 352 589 02 37 00) using setting 3 on pliers.

Note:

^

The cable tie buckle (C) must not touch the bracket (B).

^

When mounting the wiring harness set (A) to the bracket (B), ensure that the wiring harness set (A) touches the bracket (B) and is mounted there
tension free, ensuring the wiring harness set (A) does not pull on the SBC connector (E).

^

After the cable set (A) is secured, it must no longer be possible to move it in the longitudinal direction toward the bracket.

^

Disregard WIS notes regarding toque settings on cable tie pliers. Use settings specified in this step.

^

The ground wires (A) must be completely wrapped with fabric tape (as performed in step 15) in the area adjacent to the SBC hydraulic unit bracket
(B) to ensure that the ground wires do not become chafed. Readjust tape as necessary to prevent chafing.

CAUTION!

Ensure harness is properly mounted to allow cable strain relief in area between cable tie and connector.

24.

Attach hose mounting strap (D, Figure 22) to mounting stud, secure with nut.

25.

Proceed to SUBJECT C - QUALITY ASSURANCE MEASURES.

C. Quality Assurance Measures

CAUTION!

Check the quality measures outlined below after completing the service procedure.

1.

Quality measure 1:

Recall - SBC Wire Harness Modifications|Page 561 > < Recall - SBC Wire Harness Modifications|Page 559