mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Evaporative Vapor Pressure Sensor > < Activated Charcoal Canister Shutoff Valve, Location|Page 4223
Page 1
background image

Evaporative Shut Valve: Description and Operation
Activated Charcoal Canister Shutoff Valve, Function

Activated Charcoal Canister Shutoff Valve, Function

Shown in the design of model 210
77 

Activated charcoal canister

Y58/4 

Activated charcoal canister shutoff valve

Ventilation via the shutoff valve

Ventilation via the safety valve

The activated charcoal canister shutoff valve (Y58/4) is actuated at the ground end by the ME control unit to conduct the leak test of the fuel system. In
case of errors in the shutoff valve (valve does not open) a mechanical safety valve (as of approx. 25 mbar) takes over the aeration of the activated
charcoal canister (77).

Evaporative Vapor Pressure Sensor > < Activated Charcoal Canister Shutoff Valve, Location|Page 4223