mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Charging System - Voltage Regulator Inspection/Testing|Page 11646 > < Charging System - Voltage Regulator Inspection/Testing|Page 11644
Page 11
background image

^

On short stud: 11.0 - 13.0 Nm

6.

Reinstall the alternator in reverse order

7.

Reinstall components in reverse order.

8.

Reconnect battery cable to negative battery terminal, reinitialize vehicle systems (e.g., steering angle sensor, power windows etc.); refer to WIS:
AR00.19-P-0200P

9.

Connect SDS and erase any faults that may have been stored.

Note:

Refer EPC for replacement part numbers.

Warranty Information 

Note:

The following allowable labor operations should be used when submitting a warranty claim for this repair.

Charging System - Voltage Regulator Inspection/Testing|Page 11646 > < Charging System - Voltage Regulator Inspection/Testing|Page 11644